A B&B hotel with 89 rooms is being built on a 2,250 m² site in the industrial area of the former barracks site in Emmerich.
Prefabricated bathrooms developed for the hotel group are being used for the first time. This reduces the pure construction time to 10 months.
The start of operations is planned for March 2025. The property has been developed as an existing building and financed as an EE40 building under the KFW 299 program.